Meet us at Big 5 Global, Dubai World Trade Centre, 23 to 26 November 2026. Stand 6D270.

Waterproofing · System 14

DPM & moisture mitigation

Stops moisture-led blistering before it starts.

Overview

Moisture rising through concrete is one of the most common reasons resin floors blister or debond.

Where testing shows elevated moisture, or a new slab must go into service early, a moisture-mitigating epoxy DPM is applied before the main floor system. It is not a substitute for structural waterproofing.

Best used in

Damp slabs
New slabs before coating
Slabs without a membrane
Remedial works after blistering

Why DPM & moisture mitigation

Key benefits

Stops moisture-led blistering before it starts.

01

Treats the cause, not the symptom

02

Coats damp or young slabs within system limits

03

Protects the finished floor

04

Works under a wide range of resin systems

Keep scrolling

Typical build-up

From substrate up.

A cross-section of a typical installation. The exact build-up and thickness depend on traffic, exposure and the condition of the substrate.

Layers shown for illustration, not to scale.

4
Chosen floor system
3
Primer or sand-scattered tie coat
2
Moisture-mitigating epoxy DPM
1
Prepared, tested substrate

Before we specify, we confirm.

Four things decide whether this is the right system, and how it should be built up.

Moisture test results
Slab age and construction
Membrane presence
Final floor system

Images and finishes illustrative; build-up typical. Final specification follows substrate assessment and current manufacturer data.

Concerned about slab moisture?

Send us the floor area, how the space is used, the location and a few photos, and we will come back with the right build-up.