Meet us at Big 5 Global, Dubai World Trade Centre, 23 to 26 November 2026. Stand 6D270.

About us

Specified, supplied
and installed properly.

One partner for specification, supply and installation, from the prepared slab to the finished floor.

Choosing a floor starts with the substrate and how the space will be used, not with the product.

About Imperial

Technical flooring and waterproofing systems, specified, supplied and installed across the UAE and GCC.

Moisture, traffic, chemicals, heat, slip and fire requirements all shape the right answer. That is why every system we offer comes with a clear account of what it is, where it works best, a typical build-up and the points we confirm before we specify it.

17
systems
5
steps, slab to handover
UAE & GCC
supply and installation

Not sure where to start? Our process sets out how we work, and our enquiry form tells you exactly what to send us.

Specification

We match each system to the use, traffic, chemical exposure, slip and fire requirements and the programme, from current manufacturer data sheets.

Supply

The specified system products, supplied across the UAE and GCC, with technical support for contractors and applicators.

Installation

By our team or approved installers, with preparation, edge detailing, repairs and cure times built into the programme.

Fix the cause first, then build the floor on it.

Most resin floor failures start with poor preparation. Our process puts it first.

Operatives repairing and levelling a concrete floor
01

Assess

We review the floor area, intended use, location and photos, then survey the substrate: condition, moisture, existing coatings, joints and levels.

02

Specify

We match the system to the use, traffic, chemical exposure, slip and fire requirements and the programme, using current manufacturer data sheets.

Bundles of MST-BAR GFRP rebar being moved by forklift
03

Supply

We supply the specified system products across the UAE and GCC, with technical support for contractors and applicators.

Moisture-mitigating epoxy DPM being rolled onto a slab
04

Install

Installation by our team or approved installers, with preparation, edge detailing, repairs and cure times built into the programme.

Grey gloss high-build epoxy floor in a warehouse with racking
05

Hand over

The finished floor is handed over with care and maintenance guidance, so it keeps performing as specified.

Manufacturer partners

We work directly with the manufacturers behind our specialist systems.

PSI logo
Poly-Tuff Systems International, USA

PSI FlexiDeck®

Imperial Resin Works is PSI’s specification, supply and installation partner for the UAE and GCC, for liquid-applied waterproofing and traffic-deck systems.

MST-BAR logo
MST Rebar Inc., Canada

MST-BAR® GFRP rebar

Imperial Resin Works is introducing MST-BAR® to the UAE market, providing technical support, specification guidance and supply.

Meet us at Big 5 Global

Dubai World Trade Centre, 23 to 26 November 2026. Stand 6D270.